Skip to content

Quality

Inspected in India. Trusted at your dock.

Distance is only a risk if nobody qualified is standing next to your parts. Our quality engineers inspect at the source, so what arrives is what you approved.

Three stage inspection

Quality is a process, not a final check

A part that fails final inspection was already scrap an hour after machining started. That's why we inspect at three points, not one.

Incoming Inspection

Raw material is verified against the mill certificate before machining begins: grade, heat number, dimensions, and condition. Wrong material caught here costs nothing; caught later it costs the lot.

In Process Inspection

Approval of the first piece before a production run, then patrol inspection during it. Critical dimensions are checked while correction is still possible, with records tied to machine and operator.

Final Inspection

Every lot is measured against a ballooned drawing before packing, per an AQL sampling plan or 100% for critical features. Nonconforming lots are quarantined in India, they never ship.

Packing Inspection

Preservation, part protection, labeling, and crate integrity are verified and photographed before the container closes. You see your parts packed before they leave.

Measurement & testing

Verified with instruments, not opinions

Dimensional Inspection

Calibrated micrometers, bore gauges, height gauges, and thread gauges, with every measurement traceable to a calibration record.

CMM Measurement

Coordinate measuring machines for GD&T verification: position, profile, flatness, and datum referenced features, reported feature by feature.

Surface Roughness Testing

Stylus profilometry with Ra and Rz reported alongside cutoff length and measurement direction, the details that make a roughness number meaningful.

Hardness Testing

Rockwell, Brinell, and Vickers testing to verify heat treatment results, with case depth certification where specified.

Documentation

Paperwork your auditors will approve of

Regulated industries live and die by documentation. Ours is prepared to be audited, not just filed.

Material Certificates

EN 10204 3.1 as standard, with heat number traceability from melt to finished part. 3.2 with third party witnessing available for critical applications.

PPAP

Production Part Approval Process submissions (typically Level 3): process flow, control plan, MSA, capability studies, and part submission warrant.

FAI

First Article Inspection reports on every new part or revision: full dimensional layout in AS9102 style format before production release.

Inspection Reports

Every shipment carries a dimensional report mapped to a ballooned drawing, plus photographic evidence of parts and packaging.

Quality process flow

Eight gates between your drawing and your dock

  1. 1

    Drawing review

    Critical characteristics identified; inspection plan agreed before quotation.

  2. 2

    Supplier quality plan

    Control plan and sampling levels set with the factory before production.

  3. 3

    Material verification

    Incoming raw material checked against mill certificates.

  4. 4

    First piece approval

    Production starts only after the first piece passes full layout.

  5. 5

    Patrol inspection

    Checks at defined intervals during the run.

  6. 6

    Final inspection

    Lot measured against ballooned drawing; reports compiled.

  7. 7

    Packing verification

    Preservation, labeling, and crating checked and photographed.

  8. 8

    Document release

    Certificates and reports shared for your approval before dispatch.

Ask for a sample inspection report

The fastest way to judge a quality system is to read its output. Request an anonymized dimensional report and PPAP sample with your quotation.